CUXHAVEN SEWAGE TREATMENT PLANT ELECTRICAL CONTROL SYSTEM TECHNOLOGY, SLUDGE DEWATERING

Short description

Refurbishment of control system, sludge dewatering

Planning, construction and production of the low-voltage switchgear and control system

Expansion of the switchgear room

Installation of a raised floor

Delivery and installation cable and pipeline network

Connection, commissioning and functional test of the system

Contract total

€ 240,000

Customer

EWE Wasser GmbH
Humphry-Davy-Strasse 41
27472 Cuxhaven