COGENERATION PLANT FISCHEREIHAFEN REPLACEMENT OF THE AEG CONTROL SYSTEM WITH A PCS7 SYSTEM
Short description
Conversion of the existing AEG control system to PCS7 V7.1 SP1 during operation.
The following automation station was delivered and programmed for this purpose
1 pc 414-3H
The following server and operating stations were delivered and configured for this purpose.
- 1 pc redundant OS server pair
- 1 pc Engineering station
- 3 pcs OS client as operating station with 1 and 2 monitors
- The volume is 310 process objects
Contract total
€ 195,000
Customer
FBG mbH
Lengstr. 1
27572 Bremerhaven